C.J.
MacLellan & Associates provided pre-construction (on-site) assessments
of three existing timber crib wharves, a timber board walk, a proposed
double concrete launching facility, service area paving and a new
electrical system to service the three reconstructed wharves. Project
construction was carried out in 1998 under our firm's construction
inspection. Responsibilities included material take-offs, cost
estimates, construction drawings and on-site supervision. |